Amr Yassin logo
Personal mark / 01 Amr Yassin 4D · 5D · Digital twins
AECO digital delivery
Open to roles · consulting · training
Amr Yassin — AECO Digital Delivery

Design, time
and cost —
as one system.

One interactive model you can actually walk through. I build 4D / 5D simulations, digital twins and real-time walkthrough applications that turn fragmented model, schedule and cost data into a single, decision-ready source of truth — from early design through construction, handover and facility management.

Revit Navisworks Synchro Unreal Engine Twinmotion Power BI Primavera P6 Dynamo

01What I do

Three ways complexity
becomes understandable.

Every project already has the data. What it usually lacks is a way for people to see it, question it and agree on it — together, before it costs money.

01

Interactive 4D & 5D simulation

Construction sequencing driven by logic, zones and design intent — not by colouring in a finished programme.

  • Early-stage 4D aligned with design development
  • Zone, phase and method-driven sequencing
  • Cost and quantity linked to time (5D)
  • Visual decision support beyond static schedules
02

Interactive digital twins

Real-time, navigable project environments that stay useful long after handover.

  • Data-linked models for construction, FM and asset understanding
  • Live progress, status and issue overlays
  • Designed for non-technical stakeholders
  • Built to extend into operations, not stop at practical completion
03

Walkthrough applications

Game-engine experiences that let people explore a project instead of being presented to.

  • Interactive walkthroughs built in real-time engines
  • Stakeholder, client and approval-facing experiences
  • Marketing and sales environments for unbuilt projects
  • Deployed to desktop, web or headset
02About
Amr Yassin Amr Yassin

I work where design intent,
the programme and the model
are supposed to meet.

I'm a 4D simulation professional working at the intersection of architectural design, construction planning, real-time visualisation and technical development. My work focuses on integrating fragmented AECO project data into a central, interactive source of truth — allowing stakeholders to understand, explore and make decisions without relying on assumptions or disconnected schedules.

That means sitting between the people who rarely share a screen: the design team, the planner, the cost manager and the site. When those four views are stitched into one model that moves through time, arguments turn into decisions and decisions get made earlier — when they are still cheap.

“4D and 5D should start on day one of a project — not after problems appear. When time, cost and design intelligence are embedded early, projects gain clarity, alignment and predictability across all phases.” — Amr Yassin
03Founder

The platform version
of everything on this page.

Counttable is what happens when the work stops being a service and becomes a system: design, construction, cost, time and intelligence connected into one living workflow. I founded it to close the gap I kept meeting on projects — the one between a model that is technically correct and a team that actually understands it.

Design. Build. Understand. Everything.

01Design — massing becomes BIM.
02Planning — the schedule wraps around the building.
03Quantities — the model prices itself.
04Construction — progress reads back into the plan.
05Digital twin — the building becomes transparent.
04How I work

Five moves, in this order.

Skipping any one of them is why most 4D ends up as an animation nobody uses.

01

Design understanding

Architectural intent and constructability first. Before anything is sequenced I need to know what the building is trying to be, and where it will fight the people building it.

02

Data structuring

Align model, time and cost logic. Naming, zoning, WBS and parameter discipline — the unglamorous layer that decides whether everything downstream is trustworthy or theatre.

03

Visual intelligence

Convert complexity into readable systems. Colour, hierarchy and time used deliberately, so a director and a foreman can read the same screen and reach the same conclusion.

04

Interactivity

Enable exploration, not passive viewing. People trust what they can interrogate — so the output is something to click through and challenge, not a video to sit through.

05

Lifecycle thinking

Extend value into FM and operations. The model that helped you build it should be the model that helps you run it for the next thirty years.

05Work with me

Three ways in.

Whether you need a person on the team, a system delivered, or a team taught to do it themselves.

01 — Hire

Senior & lead roles

Full-time or embedded inside your delivery team, owning digital delivery from standards through to handover.

  • 4D / 5D & VDC lead
  • BIM & digital delivery management
  • Digital twin and visualisation strategy
  • Standards, workflows and team capability building
Download CV
02 — Consult

Project-based delivery

A defined scope, delivered end to end — from kickoff data audit to the final interactive handover.

  • 4D construction sequences & method statements
  • 5D cost-loaded simulation
  • Digital twin builds and dashboards
  • Tender, bid and stakeholder visualisation
Start a project
03 — Coach

Training & coaching

For construction teams and individuals who want the capability in-house rather than outsourced forever.

  • Team workshops on 4D / 5D adoption
  • One-to-one career coaching into VDC & digital delivery
  • Standards and workflow setup for your tools
  • Talks, guest lectures and industry sessions
Book a session
06Selected work

Selected work.

A cross-section of sequencing, twin and real-time work — from construction logic to the operational picture.

High-rise construction sequence with amber phase overlays
4D Sequencing

High-rise structure sequence

Zone-driven 4D simulation aligned to the construction methodology and reviewed weekly against site.

Cutaway building digital twin with connected systems
Digital Twin

Operations-ready asset twin

Navigable twin linking asset data, systems and status for the facilities team from day one of handover.

Contemporary interior walkthrough with phased finish overlays
Real-time / Unreal

Client walkthrough application

Standalone interactive build letting the client explore options, finishes and phasing without a presenter.

Building model with transparent cost and progress layers
5D / Cost

Cost-loaded programme simulation

Quantities and cost mapped onto the sequence to show cash flow and earned value moving through the build.

Construction logistics plan with delivery routes and staging areas
Bid Support

Tender methodology visual

Sequencing and logistics story built to win work — the method statement, made watchable.

Building progress intelligence scene with connected data points
Dashboards

Live progress intelligence

Model-linked dashboard turning weekly site data into a picture the whole project team reads the same way.

08Direction
Vision

To redefine how AECO projects are planned, communicated and operated — by making 4D and 5D intelligence the central nervous system of a project, from design to operation.

Mission

To design integrated 4D simulations, digital twins and interactive systems that convert complex project data into clear, visual and actionable information — supporting confident decisions across every phase.

The whole argument, in one line

Projects fail not because of lack of data, but because of lack of understanding.


09Contact

Tell me what you're building.

A role, a project, a team that needs the capability — or a conversation about Counttable. I answer everything.

Prefer email? amrrryassin@gmail.com

Based in the AECO industry, working with teams internationally — remote-first, on site when it matters.